Special Containerized
-
Because the capacity of the available crane on the supply vessel was too small, part of the machinery equipment can be withdrawn as you can see from following photos.
-
In the container remains the cooling system and fuel tank for 24 hours
-
The unit during a 24-hour test program (pump 1200 m3/h - 16 bar)
-
The unit at site, also for ice-production in Caspian Sea